The contract strengthens Tubacex’s position as an integrated supplier to major nuclear projects through the GNMS consortium, combining specialised manufacturing, project management and full traceability.

Bilbao, 17 November 2026. Tubacex, through the GNMS consortium, has secured a contract to supply a package of tubes and fittings for Sizewell C, the new nuclear power project in Suffolk, United Kingdom.

Sizewell C will comprise two UK-EPR reactors generating 3.2GW and is designed to replicate the technology and experience developed at Hinkley Point C, supporting the deployment of new large-scale, low-carbon nuclear generation capacity in the UK.

The scope awarded to Tubacex involves IBF in Italy and SBER in Austria, together with other partners as part of the GNMS consortium, bringing together specialised manufacturing capabilities within a coordinated industrial structure.

The GNMS consortium was co-founded by Tubacex in 2014 to provide an integrated response to the increasingly complex requirements of major nuclear projects. Through the complementary capabilities of its members, GNMS offers customers an integrated tubular scope combining products, project management, supply-chain coordination and on-time delivery.

This model enables GNMS to coordinate complex nuclear packages through a unified execution approach and full operational and documentary traceability, meeting the stringent quality requirements of the nuclear industry.

TUBACEX’s nuclear portfolio includes a broad range of tubes for critical applications, including high-pressure steam piping systems and heat exchangers for the primary circuit, as well as the reactor control system. All of these are classified as safety-related systems, designed to meet the demanding requirements of next-generation nuclear technologies, including Small Modular Reactors (SMRs).